Hunan Heou Engineering Consulting Co., Ltd

Hunan Heou Engineering Consulting Co., Ltd

Manufacturer from China
Active Member
4 Years
Home / Products / Ground Enhancement Material /

Flexible Lighting Protection System

Contact Now
Hunan Heou Engineering Consulting Co., Ltd
City:changsha
Province/State:hunan
Country/Region:china
Contact Person:Mrcody
Contact Now

Flexible Lighting Protection System

Ask Latest Price
Video Channel
Brand Name :HAMMOND
Model Number :HD-R10Y
Certification :ISO9001
Place of Origin :China
MOQ :Negotiable
Price :Negotiable
Payment Terms :L/C, T/T
Supply Ability :1000
Delivery Time :8 days
Product name :Flexible Grounding Electrode
Material :Flexible Material
Function :Lighting Protection
Product Keywords :Blocking agent,Flexible grounding body,Resistance reduction materials
CERTIFICATE :ISO9001 / CE
weight :1kg
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Resistance Reduction Flexible Lighting Protection System With CE Approval
Construction of flexible grounding body
(1) Flexible grounding body is a kind of compound formula product. It includes:
conductive agent, preservative, blending agent, flexibility agent, channel agent,
coagulant, catalyst, etc.
(2) First dig the grounding trench, weld the horizontal grounding body, and the
vertical grounding electrode.
(3) Open the lid of the barrel and take off the two bags of raw materials stuck to
the inner lid.
(4) Open the plastic bag and turn the plastic bag over to the outside of the
barrel with a wooden stick into the barrel to stir the sediment and liquid. (When the
temperature is low, you should use a heating rod to warm up the liquid in the barrel
to about 30 degrees)
(5) Open the two external bags of raw materials and add them to the liquid and
stir well, and take them to the edge of the ditch, or the pit, to be used.
(6) As vertical pouring can be poured directly.
(7) If you do horizontal pouring, you need to keep stirring slowly until the
resistance of the liquid in the barrel increases and becomes sticky like porridge, then
pour it into the trench to wrap the horizontal grounding body and form a long line of
pouring while pouring.
(8) wait for its solidification to form with elastic grounding conductor, at this
time will no longer dissolve in water, can be backfilled, the construction of flexible

Specification
Flexible Lighting Protection SystemFlexible Lighting Protection SystemFlexible Lighting Protection SystemFlexible Lighting Protection System

Inquiry Cart 0